FAST-TRACKED APPROVAL

Complying Development Certificates (CDC)

A Complying Development Certificate (CDC) is a fast-tracked NSW approval path combining planning and construction consent into a single certificate issued by an accredited private certifier instead of council. A CDC applies for projects that meet standard NSW State Environmental Planning Policy (SEPP) criteria and must be obtained before any construction or groundworks begin on site.

Recommended for standard builds
CDC Pathway

Private Certification

Best for new homes, secondary dwellings, renovations, and outdoor structures that comply with standard NSW code requirements.

Fast Turnaround

Determined in as little as 5 to 20 days once documents are lodged.

Accredited Private Certifier

Assessed directly by CertifiBuild without waiting on local council queues.

Combined Single Approval

Planning permission and Construction Certificate (CC) issued together in one document.

Statewide SEPP Standards

Applies to projects strictly satisfying State Environmental Planning Policy criteria.

DA Pathway

Development Application

Required when project designs exceed state limits, seek planning variations, or sit on heritage/environmentally sensitive land.

Extended Timeline

Typically takes 3 to 6+ months depending on council assessment backlogs.

Local Council Planning Department

Assessed by town planners, panel committees, and council officers.

Two-Stage Approval Process

Requires separate Development Application (DA) consent followed by a Construction Certificate (CC).

Site-Specific Variances

Required when building designs exceed standard SEPP controls or require planning merit review.

Unsure if your project qualifies for a CDC? Send us your architectural plans for an obligation-free preliminary check.

Request a plan review
NSW Fast-Track Approvals

How your CDC approval works

Four clear steps from initial plan checks through to on-site commencement across New South Wales.

01Step 1
Eligibility check & document review
We review your architectural plans, site survey, and section 10.7 certificate to verify your project qualifies under NSW Complying Development rules.
02Step 2
Assessment against SEPP standards
Our accredited certifiers check technical compliance including BASIX certificates, boundary setbacks, building height limits, and gross floor area.
03Step 3
CDC issued & lodged on NSW portal
Once all statutory requirements are satisfied, we issue your Complying Development Certificate and register the determination on the NSW Planning Portal.
04Step 4
Notice of commencement filed
Before tools hit the ground, we file the formal Notice of Commencement with council and assign your principal certifier for mandatory site inspections.

Ready to verify your building plans?

Send us your architectural drawings for a preliminary CDC eligibility review within 24 hours.

NSW Complying Development Specialists

Get your CDC approved in days, not months

Skip long council queues with certified NSW private certifiers. We assess your plans under NSW statutory planning codes so your build starts without delay.

Fast 5 to 10 day average turnaround
Fully accredited NSW private certifiers
Direct statutory approval for compliant plans

Class 1 residential dwellings, duplexes, granny flats, and Class 10 outdoor structures across New South Wales.