Preliminary Assessment

Preliminary CDC assessments in NSW

A Preliminary CDC Assessment is an initial, non-binding eligibility review that checks your proposed site zoning, boundary setbacks, building heights, floor space ratios, and NSW SEPP criteria. Undertaken during early planning before finalizing full architectural plans, it confirms whether your build qualifies for fast-tracked Complying Development or requires a local Council DA.

CertifiBuild's accredited NSW certifiers conduct the Preliminary CDC Assessment, typically requested by the property owner or their builder/architect during early project planning.

Zoning & Land Use

Verify your planning zone (e.g. R2, R3, RU) and confirm that your planned residential or secondary building type is permitted under NSW legislation.

Setbacks & Height Limits

Assess proposed front, rear, and side boundary distances alongside maximum building height thresholds to guarantee complying development compliance.

Floor Space Ratio (FSR)

Calculate allowable gross floor area and landscaped area percentages against lot size requirements to avoid costly architectural redesigns.

SEPP Eligibility

Cross-check environmental planning policies, bushfire risk, heritage overlays, and tree preservation rules before lodging formal CDC documentation.

Ready to verify your site plans before drafting?

Speak with our accredited NSW certifiers to check CDC feasibility.

Request assessment
Preliminary Assessment

How preliminary assessment works

Know your planning pathway before you commit. We review your site controls, zoning constraints, and concept plans to clarify approvals.

STEP 01
Submit site details and plans
Upload your property address, title info, and concept sketches or architectural drawings via our streamlined portal.
Initial intake: Immediate
STEP 02
Zoning and planning review
Our accredited certifiers check your site against NSW State Environmental Planning Policies (SEPP) and local council controls.
In-depth compliance scan
STEP 03
Written eligibility determination
Receive a formal assessment confirming whether your project qualifies for Complying Development (CDC) or requires a DA pathway.
2-3 business days
STEP 04
Fast-track lodgement
Once your pathway is determined, we guide your consultant team on required documentation to lodge for speedy certification.
Next step support

Ready to review your upcoming project?

Submit your plans today for an accredited determination in 2-3 business days.

Check if your build is ready for certification

Find out upfront whether your residential or outdoor project qualifies for private certification before you commit time and council fees.

Fast preliminary review
Clear compliance checklist
Accredited NSW certifiers