Book inspectionRequest a quote

Campbelltown City Council

Private building certifier in Bradbury

Bradbury’s houses went up between the 1950s and the 1970s, and building methods changed across those decades. We help owners plan extensions, pools and garages around the house they actually have.

NSW 2560

Class 1 homes and Class 10 structures

Local rules

Three estates, one suburb: building in Bradbury

How Bradbury was built

The name honours William Bradbury, an innkeeper. Part of his 300-acre landholding was cut into lots in October 1844. Modern Bradbury grew in three stages. The St Elmo estates came first in the mid-1950s. In 1959 Lend Lease acquired land for Macquarie Heights, where the first homes won approval in August 1960. Next came Sherwood Hills in March 1965, with more than 350 homes up within three years. Residents had pushed for the name Sherwood Hills, but Bradbury became official in March 1969. At the 2021 Census there were 9,433 residents. Of 3,208 homes with people in them, 2,844 were stand-alone houses, so the suburb is still mostly detached.

Covenants on title

Sherwood Hills buyers were promised power cables underground, and the estate ruled out red tiled roofs and front fences. Restrictions like these can still be registered on title today. They are private rights, not planning rules. Your certifier has no role in enforcing them, and a building approval leaves them in place.

Flooding and renewal areas

Campbelltown Local Environmental Plan 2015 is the main instrument. Bradbury falls inside the area council examined for its Southern Catchments Flood Study. Part of Bradbury also lies in the renewal area shared with Airds, which gets its own section in council's DCP (detailed design rules). That section covers just the land mapped for renewal, not lots in private hands.

Typical work

Common projects and how they get approved

What owners build here

Older houses in Bradbury bring a familiar list of jobs:

  • Extensions and second storeys. A 1950s frame and a 1970s frame carry loads differently.
  • Pools and patio roofs. Common in large, established back yards.
  • Replacement garages, carports and sheds. Many originals are now worn out.
  • Granny flats. Feasible on lots wide and large enough.

Earlier additions sometimes went up without approval. Those are often the first thing to resolve.

How approval usually works

Some minor jobs are exempt. Otherwise you pick a CDC, which a certifier approves quickly when fixed standards are met, or lodge a DA and later get a construction certificate. Flood affectation or unapproved older work can steer a job to a DA. A covenant can halt a project even once it is approved, so search the title at the start, not at settlement. The flood study covers Mansfield Creek, Spring Creek and smaller tributaries running to the Georges River. Your lot's position is not settled just because the suburb is named in it. Send a title search, a survey and any council flood letter first. CertifiBuild then flags title and structural issues before any drawings are finalised.

Local questions

Questions we hear about this suburb.

No two lots in Bradbury are the same. Give us your address and we will check every map that affects it.

See the council page

Can an old Sherwood Hills covenant block my Bradbury project?

Yes, it can. Sherwood Hills buyers were sold homes under estate rules such as no front fences, no red tiled roofs and underground power, and restrictions like these may still be registered on your title. They are private rights that run with the land, separate from planning law. Certifiers have no role in policing them, and your approval leaves them fully in force, so whoever holds the benefit could still act after your project is approved. Order a title search at the very start, before drawings are finalised, not at settlement.

Does Bradbury being in a flood study mean my house floods?

No. Council’s Southern Catchments Flood Study looked at Mansfield Creek, Spring Creek and smaller streams running to the Georges River across several suburbs, including Bradbury. Being named in it is not a ruling on your lot. Council issues flood information property by property, and it is this advice that fixes floor levels and shows where a pool, extension or retaining wall could sit. Ask council for that letter early and include it with your survey. Where flooding does affect the block, you may need a development application rather than a fast-track certificate.

Do the renewal area controls apply to my privately owned lot?

Usually not. The renewal area shared with Airds is dealt with in a dedicated part of council’s design rules, but it covers only the land mapped for renewal, and lots marked as private are excluded. The large majority of Bradbury lies beyond it. Check your address against the plan’s maps rather than guessing. If your lot is private, the normal residential controls and the Campbelltown Local Environmental Plan 2015 apply. Then the bigger questions are usually your house’s age, its structure, any title restrictions and flood information.

Building in this suburb?

Send us the address first.

We check the local maps for your lot, confirm the approval path and quote in writing.