Principal certifier for your build

Independent oversight from the day work starts to the day you move in, with inspections and records handled by one team.

Two-storey home nearing completion with scaffolding along one side and materials on site

The role at a glance

What a principal certifier does

With a CC or CDC in hand, a principal certifier must then be appointed before construction gets under way. That certifier inspects each required stage, keeps the compliance record and decides whether the occupation certificate can be issued.

The appointment is made by the owner, not the builder. The principal certifier is an independent regulator, so the builder stays responsible for the quality and progress of the work.

Appoint your principal certifier

Appointed by the owner

You choose the principal certifier. A builder cannot make the choice for you.

Inspections at key stages

Required stages are inspected and recorded as the build progresses.

A complete record

Inspection results and certificates are kept together for the final assessment.

The occupation certificate

Once the build is complete, the principal certifier decides whether to issue the OC.

A clear way forward

From appointment to occupation

The principal certifier role follows your project through six stages.

  1. 01

    Appointment

    You sign our certification contract and appoint us before construction begins.

  2. 02

    Pre-start review

    We check the approval, plans and conditions and confirm the inspections your project needs.

  3. 03

    Notices given

    Council is notified of the appointment and the start date as the regulations require.

  4. 04

    Stage inspections

    Your builder books every inspection while the work is still visible, and we record the outcome.

  5. 05

    Issues resolved

    Any non-compliance is raised with you and the builder and checked again once fixed.

  6. 06

    Final assessment

    We carry out the final inspection, review the documents and determine the OC.

Before work starts

What we need to take on the role

If you are changing certifiers part way through, we also need the earlier inspection records.

  • Your approvalThe CC or CDC with its stamped plans and conditions.
  • Builder detailsLicence and insurance particulars, or owner-builder permit details.
  • Start dateThe planned commencement date so inspections can be scheduled.
  • Supporting reportsEngineering and other reports referred to in the approval.

Project-specific pricing

Priced for your project.

Our principal certifier fee depends on how many inspections are needed and how large the build is. You get a written quote before you appoint us.

  • Number of inspections
  • Project size and type
  • Site location
  • Conditions to verify at completion
Request a quote

What are you planning?

Projects we oversee.

We act as principal certifier for Class 1 homes and Class 10 structures across our service areas.

Exempt development does not need a principal certifier. Check the requirements for your project before starting.

Common issues

What causes problems on site

These three issues are behind most of the late-stage delays we see.

The start

Appointing too late

Work that starts before a principal certifier is appointed can leave gaps that are hard to fix.

The records

Missing handover files

When certifiers change, approvals and inspection records must transfer in full.

The stages

Inspections missed

Covering work before it is inspected can prevent the occupation certificate being issued.

Certifier rules

Certifier regulation and accountability

A principal certifier is the official who oversees your building work and issues its certificates. They are public officials, not agents of your builder. NSW law sets their registration, conduct and response to faulty work, and Building Commission NSW oversees them.

Sources: Building Commission NSW: Applying to become a certifier; Building Commission NSW: Working as a certifier; Building Commission NSW: Conflicts of interest; Service NSW: Find a principal certifier; NSW Planning: Guidelines for written directions notices. General information only; requirements depend on your lot, design and approval.

How are certifiers registered?

In NSW, certifiers hold registration under the Building and Development Certifiers Act 2018. Building Commission NSW handles registration, audits and discipline. Registration classes include building surveyor unrestricted, building surveyor restricted to all building classes, building surveyor restricted to Class 1 and 10 buildings, building inspector and swimming pool inspector, among others.

Each class limits the work a certifier may do. Certifiers must also hold professional indemnity insurance and complete ongoing training every year. They are bound by a code of conduct as well as the Practice Standard for Registered Certifiers. Compliance with the Practice Standard is a registration condition.

Checking a certifier's registration

The public register of building certifiers tells you if a person or company holds current registration, and in which class. Search with the status set to registered and choose the class your project needs.

Building Commission NSW also publishes a Certifier Disciplinary Register. It lists action taken against current and former certifiers.

Conflicts of interest explained

Certifiers cannot inspect or issue certificates where a reasonable person would see a private interest clashing with their public duty. Examples include being the applicant, having worked on the design, or having a family, personal, work or business link with someone who has a private interest. Building Commission NSW notes penalties of up to $33,000 for breaking these rules.

A certifier may explain the legal requirements. But they must not advise how to change plans to comply, or propose design options such as a performance solution (a custom way of meeting the building code). For Class 1 and 10 buildings there is a narrow exception. The certifier may advise on meeting the building code's standard (deemed-to-satisfy) rules.

Dealing with non-compliant work

Sometimes a private principal certifier finds work that does not follow the approval or approved plans. NSW law then requires a written directions notice to the person responsible. It describes the problem, the fix needed and the time allowed. Problems found during a critical stage inspection are handled through that inspection instead.

After the deadline, the certifier returns to check and records the result. If the direction was not followed, they must notify council and the land owner and send them the notice. Further action, such as an order, then rests with council. Private certifiers can no longer issue those.

Replacing your certifier by agreement

Owners can replace the principal certifier part way through a job. The quickest path is agreement between the owner, the existing certifier and the incoming one. The incoming certifier must tell the existing certifier and the council, and can only be appointed after that notice has been given.

Once appointed, the replacement sends a notice of the change to the council, and to the consent authority where that is a different body, within 2 days. A new certifier does not have to accept the job. Before agreeing, they should go through the approval and the inspection history and raise any problems with the outgoing certifier, so the CC or CDC can be reissued correctly if needed.

When agreement is not possible

If the existing certifier will not agree, the owner applies to Building Commission NSW for approval to replace them. The application has to explain why, for example alleged negligence or incompetence, or conduct that falls short of the rules certifiers must follow, with the events, dates and places set out. No new certifier can be appointed until the application is approved, and the council and the former certifier must then be told.

Building Commission NSW puts its average assessment time at six to eight weeks, and longer when it needs more information. Allow for that gap in your build program. A builder cannot make this application, even with the owner's written support. The only exception is an owner-builder.

The same application is used when your certifier's registration expires, is suspended or is cancelled. In that situation the certifier must tell you immediately.

Your certification contract

Before any certification work starts, the certifier needs a contract signed by the approval holder. A government information sheet explaining the certifier's role and your own responsibilities must come with it. Read both, because together they set out which inspections are included and what you must supply along the way.

Some contracts include termination clauses. Even so, NSW law deals with replacing a principal certifier rather than simply ending the role, and finding the replacement is the applicant's job. A new certifier still has to take over through one of the two processes above.

Complaining about your certifier

Start by speaking with the certifier, and contact your council as well. Councils have power to deal with non-compliant development whenever it arises, including ordering rectification. Keep notes of each call and copies of every email. If the council decides not to act, ask it for a formal response giving its reasons, as that becomes useful evidence later.

Building Commission NSW takes complaints through an online form. You will need a written account of no more than 350 words, the certifier's registration number, photos and records of contact, and copies of the approval, plans, any OC and the principal certifier appointment.

If the complaint is proven, the certifier may face disciplinary action. That action is published, though your name is not. Your complaint may be passed to the certifier. You can ask to remain anonymous, although that can make the allegations harder to prove.

What a complaint cannot achieve

Building Commission NSW has no power to halt a building site, as stop-work orders come only from councils. Nor can it pay compensation, cancel a CC, CDC or OC, even one issued improperly, or sort out civil issues like fencing, easements and encroachments.

Urgent safety problems, such as a dangerous excavation or a pool left without a compliant barrier, should go straight to the council. Disagreements with a builder over defective or incomplete work follow a separate dispute resolution path, since the certifier does not supervise the site or ensure the quality of the work.

More sources: Building Commission NSW: Replacing a certifier; Building Commission NSW: Complaints about certifiers; Building Commission NSW: What certifiers do; NSW Planning Portal: Before you start your build; Building Commission NSW: FAQs for building certifiers; City of Newcastle: The principal certifier, inspections and occupation certificates. General information only; requirements depend on your lot, design and approval.

Your questions, answered

Principal certifier, explained.

What owners usually ask before appointing a principal certifier.

Ask us about your project
Who appoints the principal certifier?

The owner normally makes the appointment, or someone else who holds the benefit of the development consent. Builders are not allowed to choose for you or influence your choice, although they may recommend someone. The appointment is lodged on the NSW Planning Portal and backed by a signed certification contract, which comes with a government information sheet on the certifier's role. Where a registered certifier rather than the council takes the role, council must hear of it no later than two days ahead of any building work. Appoint once your CC or CDC is issued, and before anything happens on site.

Does the principal certifier supervise my builder?

No. A principal certifier acts as a public regulator and does not run the job or oversee trades day to day. Your builder remains answerable for following the stamped plans and for every subcontractor's work. The certifier inspects at the required stages, may ask for documents showing compliance, and decides at the end whether the home is fit to occupy. Those checks do not extend to the quality of fittings and finishes, so standards of paintwork, joinery or tiling belong in your contract with the builder. Where work does not match the approval, the certifier issues a written direction to the person doing it.

Can my CC certifier also act as principal certifier?

Yes. The certifier who issued your construction certificate (CC) can also be appointed as principal certifier, but you are not obliged to use the same one. They are separate appointments with separate duties: the CC is the check of detailed drawings before work begins, while the principal certifier looks after each required site visit and, at the end, the occupation certificate. Using one certifier for both means fewer documents changing hands. If you choose someone different, give them the complete CC package, including stamped drawings, approval conditions and any engineering, so the inspections can be planned properly.

Can I change principal certifier mid-project?

Yes, owners can replace a principal certifier during a project. When all three parties agree, the incoming certifier notifies council, takes the appointment, and then lodges a notice of the change within 2 days. If the existing certifier will not agree, the owner must seek approval from Building Commission NSW, giving reasons. No replacement can start until that approval is given. The Commission's assessments average six to eight weeks. A builder cannot apply in your place. Ask the incoming certifier to review the inspection history first, since gaps in the records can affect the occupation certificate.

What if the work is not compliant?

The principal certifier must give a written direction to the person doing the work when it departs from the approval, its plans or its conditions. The direction sets out the problem, what must be fixed and the time allowed. The certifier then checks the outcome. If the work is still not fixed once that time runs out, a copy goes to the council, which can take enforcement action such as an order. For minor items noticed at an inspection, a supporting certificate placed on file may be enough, without another trip to site.

Where we work

Principal certifier services across NSW

We work in 39 council areas, from Newcastle and the Central Coast through Greater Sydney and the Blue Mountains to Lithgow, the Southern Highlands and the Illawarra. Local rules shape every approval, so start with your council or suburb.

Council areas

Local planning notes by suburb

See all 39 council areas

Before the first shovel

Appoint your principal certifier.

Forward your CC or CDC along with the site address. We'll list the inspections needed and provide a written quote.